Abstract
A 0.39 ha constructed wetland in Athens County, Ohio is being evaluated for its ability to remove contaminants from acidic mine drainage. The wetland receives water flow from Lick run stream which is contaminated by two major abandoned underground mine seeps. The wetland effluent is then directed back into Lick Run, a tributary of the Hocking River. Data were collected 1.5 years prior to construction and 11 months following completion of the passive wetland system. Preconstruction data reported average spring quarter 1991 and 1992 iron concentrations in the stream at the future wetland influent and effluents sites to be 330 and 106 mg/l, while spring quarter 1993 showed iron levels at the wetland influent and effluent to be 64 and 3 mg/l, respectively. Iron removal percentages were 68% prior to the construction of the wetland and 95% following its completion. Preconstruction data were analyzed using a dynamic computer model and preliminary comparison with the first 11 months of the wetland data show the actual iron removal rates to be 4 g/m2 day1 compared to the predicted value of 6.5 g/m2 day1 (based on data collected from April 1991--March 1992, under similar hydrologic conditions)